 
			
			Drawings & O/M Manual, Operating DCS Data, Water and Steam
				Chemistry Control Data, Pressure Parts and Others Failure and
				Repair History, 
Previous Inspection Report, etc.
				
DTechnical Review pre-outage Report with High potential failure parts Detail inspection Plan
Visual Inspection, NDT, Metallurgical condition Assessment, Chemistry Assessment
Deliverables :Exclusive Inspection and Test Report with followings,
                      - Current condition in terms of integrity of pressure and non-pressure parts 
                      - Potential problem area identification such as FAC, corrosion,
   erosion,
                        SH exfoliation, etc.
                      - Recommendable operation condition – operating rate and chemistry control
                      - Recommendations for repair and modification method with RCA
				
 
		 
			
			- Site survey with Dwg and Field condition check
                - Feasibility and Case study
				
- Repair and modification Procedure with Expected Period 
                     - Replacement material fabrication drawing with BOM
                     - Replacement material supply as order
				
Visual Inspection, NDT, Metallurgical condition Assessment, Chemistry Assessment
Deliverables :- Experienced special engineer mobilization as TA
                     - Work completion Report
				
